Walker Village

Lend Lease contracted Alloy Group to perform the demolition and environmental abatement of the Fort Hood Family Housing development in Fort Hood, Texas. Before Alloy could begin work a “Demolition Ceremony” was held to celebrate the history of Walker Village and kickoff the new phase of renovation and construction. The base consisted of 518 1950’s […]
KevToldME
Share:

Jacksonville Courthouse & Annex

Alloy Group was contracted by the City of Jacksonville, Florida for the abatement and demolition of both the Courthouse and City Hall Annex. The Courthouse, a 370,000 sqft building and the City Hall Annex , a 16-story building both required abatement prior to the full structural demolition of the buildings. At the Courthouse our team […]
KevToldME
Share:

Senior Living Retirement Community

Dry ice blasting of 175,683 SF (4 floor, stick-built, wood structure) nursing facility and memory care area. Mold inhibitor applied, performed disinfectant cleaning and controlled humidity of the areas.
KevToldME
Share:

Client Confidential

Mold remediation and microbial cleaning for a 680,000 sqft retail facility and warehouse. This project required the use of dry ice blasting to remove mold from all interior walls. Once all mold was removed from interior walls, a mold resistant coating was applied to prevent any future spores from returning.
KevToldME
Share:

Commercial Building Mold Remediation

Mold remediation services for a large commercial office building located in Shelby, NC. This project was completed in two phases. The first phase of the project required cleaning, removal and storage of office furniture and equipment along with the cleaning and storage of all ceiling tiles. Our crews removed approximately 2/3 of the total sheetrock […]
KevToldME
Share:

Former Power Plant

This project required the removal of 27,000 square feet of steel panels within a three-story building. Before demolition, the building first required the removal of lead paint and PCB’s. The challenge of this project was that the structure to be removed was encapsulated within another building. In order to protect the integrity of the building […]
KevToldME
Share:

Chaffee Village

Project: Select demo of interior and exterior features of 68 duplexes, removal of lead based paint siding. Site work to include SWPP, demo for trees and bushes, sidewalks and drives, seed and straw disturbed areas.
KevToldME
Share:

Newnan Hospital

The Potts Company employed Alloy Group to perform the asbestos abatement, lead remediation, select interior demolition and structural demolition of the Historic Newnan Hospital. The original historic hospital dates back to 1925 with multiple additions from the 1940’s, 1970’s, and 1980’s totaling 122,000 square feet. The structural demolition scope was challenging for Alloy, as it […]
KevToldME
Share:

Park City Plaza

Alloy Group was contracted by Babbidge Facilities Construction for the removal of 1196 windows with associated pcm caulk from an 18 story commercial office building. In addition to the window removal, our team also removed two curtain window walls within two garage stairwells and also removed interior sheetrock walls that contained asbestos for the installation […]
KevToldME
Share: