Warm Springs Pond

Alloy Group provides continuous overall project management and technical support duties for a 2,300-acre site that includes a lime addition/precipitation water treatment system and a high-hazard dam facility under federal Superfund regulatory jurisdiction. Responsibilities included management of agency communications and development of strategy on numerous issues, including water treatment optimization, regulatory and compliance requirements, surface […]
KevToldME

Rico Mine Site

Alloy Group personnel administered all aspects of project management for the Rico Mine site project, which consisted of elevated metal concentrations in surface water, ground water and residential soils in a small community in western Colorado. Project activities included the initiation of large-scale residential yard soil sampling and yard soil removal activities, development of water […]
KevToldME

Leviathan Mine Site

The Leviathan Mine site is a high-elevation, inactive, open-pit and underground mine on the eastern slope of the Central Sierra Nevada Mountains in Alpine County, California. In addition to site characterization activities, two water treatment systems for treating acid rock drainage (ARD) are currently being operated at the site pursuant to EPA administrative orders under […]
KevToldME

Walker Village

Lend Lease contracted Alloy Group to perform the demolition and environmental abatement of the Fort Hood Family Housing development in Fort Hood, Texas. Before Alloy could begin work a “Demolition Ceremony” was held to celebrate the history of Walker Village and kickoff the new phase of renovation and construction. The base consisted of 518 1950’s […]
KevToldME

Jacksonville Courthouse & Annex

Alloy Group was contracted by the City of Jacksonville, Florida for the abatement and demolition of both the Courthouse and City Hall Annex. The Courthouse, a 370,000 sqft building and the City Hall Annex , a 16-story building both required abatement prior to the full structural demolition of the buildings. At the Courthouse our team […]
KevToldME

Senior Living Retirement Community

Dry ice blasting of 175,683 SF (4 floor, stick-built, wood structure) nursing facility and memory care area. Mold inhibitor applied, performed disinfectant cleaning and controlled humidity of the areas.
KevToldME

Client Confidential

Mold remediation and microbial cleaning for a 680,000 sqft retail facility and warehouse. This project required the use of dry ice blasting to remove mold from all interior walls. Once all mold was removed from interior walls, a mold resistant coating was applied to prevent any future spores from returning.
KevToldME

Commercial Building Mold Remediation

Mold remediation services for a large commercial office building located in Shelby, NC. This project was completed in two phases. The first phase of the project required cleaning, removal and storage of office furniture and equipment along with the cleaning and storage of all ceiling tiles. Our crews removed approximately 2/3 of the total sheetrock […]
KevToldME

Former Power Plant

This project required the removal of 27,000 square feet of steel panels within a three-story building. Before demolition, the building first required the removal of lead paint and PCB’s. The challenge of this project was that the structure to be removed was encapsulated within another building. In order to protect the integrity of the building […]
KevToldME