22 Apr 2021

Chaffee Village

Project: Select demo of interior and exterior features of 68 duplexes, removal of lead based paint siding. Site work to include SWPP, demo for trees and bushes, sidewalks and drives, seed and straw disturbed areas.
KevToldME
22 Apr 2021

Newnan Hospital

The Potts Company employed Alloy Group to perform the asbestos abatement, lead remediation, select interior demolition and structural demolition of the Historic Newnan Hospital. The original historic hospital dates back to 1925 with multiple additions from the 1940’s, 1970’s, and 1980’s totaling 122,000 square feet. The structural demolition scope was challenging for Alloy, as it […]
KevToldME
22 Apr 2021

Park City Plaza

Alloy Group was contracted by Babbidge Facilities Construction for the removal of 1196 windows with associated pcm caulk from an 18 story commercial office building. In addition to the window removal, our team also removed two curtain window walls within two garage stairwells and also removed interior sheetrock walls that contained asbestos for the installation […]
KevToldME